Scaffold Inspection: Who Inspects, When and What to Check
How to run a scaffold inspection on an LA or Orange County job: who can inspect, when to inspect again, what tag colors mean, and a checklist tied to Cal/OSHA Title 8.
How to run a scaffold inspection on an LA or Orange County job: who can inspect, when to inspect again, what tag colors mean, and a checklist tied to Cal/OSHA Title 8.
Shoring holds up forms and wet concrete; reshoring carries the slab after stripping. See how they differ, why multistory concrete needs both, and the Cal/OSHA rules.
Shoring carries the structure; scaffolding carries the crew. Compare loads, engineer triggers and Cal/OSHA rules, and see when an LA project needs both.
A shoring tower is a braced, four-legged frame that carries heavy elevated loads posts cannot. Parts, tower vs. post, Cal/OSHA Section 1717 rules and layout steps for LA GCs.
Temporary shoring is a support system that carries the load of a structure, or part of one, for as long as that structure cannot safely carry the load itself.
Falsework is the temporary support that carries formwork and wet concrete until it cures. Learn how it differs from formwork and shoring, and Cal/OSHA permit rules.
What makes a shoring post ‘heavy duty,’ how load capacity works at different extensions, ANSI/SSFI safety-factor standards, and when standard adjustable posts aren’t rated for the job.
How screw jacks work in formwork and falsework shoring systems, the extension rule that governs safe use, and when concrete formwork and shores can actually be removed.
Adjustable shoring posts explained: how screw jack and pin-and-collar posts work, when a single post is enough vs. when you need an engineered system, and Cal/OSHA permit requirements.
LA’s mandatory seismic retrofit ordinances drive real shoring demand. Here’s where shoring fits into a retrofit project, what’s required, and the difference between a retrofit contractor and a shoring subcontractor.