Shoring for Seismic Retrofit in Los Angeles: What GCs Need to Know
Shoring for seismic retrofit is the temporary structural support that keeps a building standing while its permanent earthquake upgrades go in. Los Angeles has some of the most aggressive mandatory retrofit ordinances in the country, and almost every soft-story, unreinforced masonry and non-ductile concrete job has a phase where a wall, floor or facade has to be relieved of load. This guide is written for GCs and retrofit contractors: where shoring fits in the sequence, which shoring method matches which retrofit, and what to have ready before you call a shoring subcontractor.
What Is Shoring for Seismic Retrofit?
Shoring for seismic retrofit is engineered, temporary support that carries a building’s load while new shear walls, moment frames, foundation bolting or cripple wall reinforcement are installed. The building stays up, and often stays occupied, during the work. Shoring is not the retrofit itself. It is the structural bridge that makes the retrofit safe to build, and it comes out once the permanent structure takes over.
For the general picture of how shoring works on any project, see our guide to shoring in construction.
LA’s Mandatory Seismic Retrofit Ordinances
Los Angeles’ Earthquake Hazard Reduction Ordinance (Ordinance 183893) covers two building types: pre-1978 wood-frame soft-story buildings (two stories or more, four or more units, with weak or open-front ground floors — think tuck-under parking) and non-ductile concrete buildings. The city has also separately mandated retrofits for rigid-wall flexible-diaphragm (RWFD) buildings and unreinforced masonry (URM) buildings.
Once an owner receives a compliance order, they generally have three years to submit an engineer’s evaluation, with construction deadlines following from there — timelines vary by building type, and non-ductile concrete buildings specifically have until 2041 to complete retrofit work. Many soft-story compliance windows have already passed, which means active enforcement and permitting activity, not a future problem — buildings still out of compliance are a live GC opportunity right now.
Where Shoring Fits Into a Retrofit Project
Soft-story ground floor work. When a tuck-under parking level or open storefront gets new shear walls or moment frames, the floors above need to stay supported while the ground floor is opened up — usually needle beam shoring carrying the load across the work zone.
Facade and URM retention. Unreinforced masonry retrofits often keep the exterior wall in place while the structure behind it is rebuilt or reinforced — raker shoring braces the facade from the outside during that window.
Phased structural work. Foundation bolting, cripple wall reinforcement, and staged shear wall installs often only need support for a defined phase of the job — a temporary shoring wall covers that window and comes down once the permanent structure takes over.
Soft-Story Retrofit Shoring: The Most Common Case
Soft-story retrofit shoring is the work LA GCs ask about most, because the ordinance targets pre-1978 wood-frame buildings with tuck-under parking or open-front ground floors. To install a new steel moment frame or shear wall at that level, the crew has to open up the bay, and the floors above still need support. The usual answer is shoring posts or needle beams carrying the floor load across the work zone, set to the engineer’s plan and removed in the order that plan specifies.
Because these buildings are often occupied apartments, the shoring layout also has to keep exits, parking access and tenant paths workable. Plan that with your shoring sub during design coordination, not on the first day of demolition.
Retrofit Type vs. Typical Shoring Method
Every job is designed by the engineer of record, but this is the usual starting point:
| Retrofit type | What gets opened up | Typical shoring method |
|---|---|---|
| Wood-frame soft-story | Ground-floor bays (tuck-under parking, storefronts) for new moment frames or shear walls | Vertical shoring posts or needle beam shoring under the floor above |
| Unreinforced masonry (URM) | Structure behind a retained facade | Raker shoring bracing the facade from outside |
| Non-ductile concrete | Columns, beams or slabs being jacketed or strengthened | Engineered vertical shoring under the affected members |
| Phased bolting / cripple walls | Short, defined work windows | Temporary shoring wall for the phase, removed after |
Seismic Retrofit Contractor vs. Shoring Subcontractor: Who Does What
A seismic retrofit contractor designs and executes the permanent upgrade — the engineering, the shear walls, the foundation anchoring, the permits for the retrofit itself. A shoring subcontractor is who that GC or retrofit contractor calls to keep the building safely supported while that work happens. Golden Scaffold works as the second: structural and vertical shoring for the duration of the retrofit, coordinated with your structural engineer’s plans, not the retrofit design or execution itself.
Cal/OSHA & Engineering Requirements
Retrofit shoring follows the same rules as any other shoring system: a permit is required once shoring or falsework exceeds 36 feet in height, and Los Angeles County requires shoring plans to be reviewed and stamped by a licensed structural or civil engineer registered in California before installation. On a retrofit, the shoring plan also has to coordinate with the retrofit engineer’s drawings. Sequencing matters, since shoring often has to come down in a specific order as the permanent structure goes in. Our licensed engineers design and stamp Golden Scaffold’s shoring plans. See our shoring engineering service.
When You Need a Shoring Sub for a Retrofit Project
You’re under a compliance order. If the city has ordered a soft-story, non-ductile concrete, or URM retrofit, the shoring plan needs to be lined up with your retrofit engineer’s timeline early — it’s one of the first trades that needs to mobilize once construction starts.
The project involves ground-floor or facade work. Soft-story and URM retrofits almost always require the building to stay occupied or standing while structural work happens beneath or behind it — that’s a shoring problem specifically.
You need a sub who coordinates with structural engineers directly. Retrofit shoring isn’t a standalone job — it has to track the retrofit engineer’s sequencing, not just hold weight.
What Golden Scaffold Does Not Do
We are a structural and vertical shoring subcontractor. We do not perform underpinning, foundation excavation or trench shoring. If your retrofit includes new footings or excavation, that scope belongs to the retrofit or foundation contractor. We support the structure above grade while they work.
FAQs About Shoring for Seismic Retrofit
What is shoring for seismic retrofit?
Engineered, temporary support that carries a building’s load while permanent seismic upgrades such as shear walls, moment frames or foundation bolting are installed. It comes out once the permanent structure takes over.
Is Golden Scaffold a seismic retrofit contractor?
No. Golden Scaffold is a structural and vertical shoring subcontractor. We provide the temporary support that keeps a building safe while a licensed retrofit contractor and structural engineer carry out the permanent seismic upgrade.
Do all LA seismic retrofits require shoring?
Not all, but most soft-story, URM and non-ductile concrete retrofits involve some phase where the structure needs temporary support, whether a ground floor is being opened up or a facade is being retained while the structure behind it is rebuilt.
What shoring is used for a soft-story retrofit?
Usually vertical shoring posts or needle beam shoring carrying the floor above while ground-floor bays are opened for new moment frames or shear walls. The engineer of record sets the layout and removal sequence.
What retrofit deadlines are still active in Los Angeles?
Timelines vary by building type and compliance order date. Non-ductile concrete buildings have until 2041 to complete retrofit work, while many soft-story compliance windows have already passed, so that work is active now. Confirm your building’s specific deadline with LADBS.
How early should shoring be brought into a retrofit project?
As early as possible once the retrofit engineer’s plans are in progress. Shoring has to be designed around those plans, so bringing the shoring subcontractor in during design coordination avoids schedule delays.
Golden Scaffold provides licensed, Cal/OSHA-compliant structural and vertical shoring for seismic retrofit, commercial, and industrial projects throughout Los Angeles and Orange County (CA License #1109519). Our team works directly with your retrofit engineer from planning through installation. Call (424) 476-4426 or visit Golden Scaffold for an obligation-free quote — and see our structural shoring services for more on how we support your next project.